• Project Code :  ERGP12173641
    • Project Description : CONSTRUCTION OF IKOT NKWO/ATAN IKOT OKORO/IKOT OSURUA ROAD WITH BRIDGE.
  • Project Budget : N100,000,000 [ One Hundred Million Naira ]
Oron or Okobo Shadow Budget Group should track this project. However, it was tracked by our Uyo Chapter. This project was tracked on the 22nd of January 2024 by Uyo Shadow Budget Group.
  • Status is Abandoned: During the tracking visit, the villagers disclosed that the Bridge is No Go Area, as no one passes there, due to bad boys that has turned the place to their crime sanctuary. The Bridge is a swamp, where; even a bicycle cannot cross to the neighbouring community. Despite the abandoned Bridge, part of Atan Ikot Okoro has been constructed. Tracking was done through the first road, beside Akwa Ibom State Polytechnic, Ikot Osurua. There was no project’s signpost, though there were unverified indications that the project may have been awarded but abandoned. This project was tracked on the 22nd of January 2024