• Project Code :  ZIP20231163
    • Project Description : CONSTRUCTION OF SOLAR POWERED BOREHOLE IN MBUKPO EYOKAN IN URUE OFFONG/ORUKO ETC AKWA IBOM SOUTH-SEANTORIAL DISTRICT, AKWA IBOM STATE.
  • Project Budget : N15,000,000 [ Fifteen Million Naira ]
Oron Shadow Budget Group was expected to track this project. This project was tracked on the 17th of February 2024 by Affiliates Coordinating Officers.
  • Status : This project was tracked by Affiliates COs on Saturday February 17, 2024. During the visit, it was discovered that the project was also located same site with the Multipurpose Hall Project, which was still ongoing in the same Community (Mbukpo Eyokan), together, with the project signpost. The project was almost at its point of completion.
error

Share The News About Ndebumog Affiliates