Project Description : Major Maintenance of Uyo-Etinan At Ikot Ekpeyak Ikono Road
Project Budget : N100,000,000 [ One Hundred Million Naira ].
This project was tracked by Nsit Ubium Shadow Budget Group on the 11th of March of March, 2025.
Status : This project was tracked on the 11th of March 2025 by Nsit Ubium Shadow Budget Group. This is a newly constructed road that we tracked last year. Curiously, we saw N100m for maintenance of this new and perfectly constructed road. We could not see a portion that may have failed that needed repairs, except, it was done in a way that no one could observe, since there was no labelling signage for this proposed work.
ACTION REQUIRED : The system have a way of restituting itself, if the political will is there. See pictorial evidence of our tracking visit below: